§ 82-241. Reporting requirements.
(a)
Baseline monitoring reports.
(1)
Within either 180 calendar days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the director a report which contains the information listed in subsection (b), below. At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the director a report which contains the information listed in paragraph (2) below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.
(2)
Users described above shall submit the information set forth below:
a.
Identifying information. The name and address of the facility, including the name of the operator and owner.
b.
Environmental permits. A list of any environmental control permits held by or for the facility.
c.
Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes.
d.
Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e).
e.
Measurement of pollutants.
1.
The categorical pretreatment standards applicable to each regulated process.
2.
The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the director, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 82-241(j) of this article.
3.
Sampling must be performed in accordance with procedures set out in section 82-241(k) of this article.
f.
Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements.
g.
Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in section 82-241(b) of this article.
h.
Signature and certification. All baseline monitoring reports must be signed and certified in accordance with section 82-239(f) of this article.
(b)
Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by section 82-241(b)(7) of this article:
(1)
The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation);
(2)
No increment referred to above shall exceed nine months; the user shall submit a progress report to the director no later than 14 calendar days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and
(3)
In no event shall more than nine months elapse between such progress reports to the director.
(c)
Reports on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the director a report containing the information described in section 82-241(a)(2)d.—f. of this article. For users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with section 82-239(f) of this article.
(d)
Periodic compliance reports.
(1)
All significant industrial users shall, at a frequency determined by the director but in no case less than twice per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. All periodic compliance reports must be signed and certified in accordance of this article.
(2)
All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.
(3)
If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the director, using the procedures prescribed in section 82-241(k) of this article, the results of this monitoring shall be included in the report.
(e)
Reports of changed conditions. Each user must notify the director of any planned significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least 60 calendar days before the change.
(1)
The director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under section 82-239(e) of this article.
(2)
The director may issue a wastewater discharge permit under section 82-239(g) of this article or modify an existing wastewater discharge permit under section 82-240(d) of this article in response to changed conditions or anticipated changed conditions.
(3)
For purposes of this requirement, significant changes include, but are not limited to, flow increases of 20 percent or greater, and the discharge of any previously unreported pollutants.
(f)
Reports of potential problems.
(1)
In the case of any discharge, including, but not limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, or a slug load, that may cause potential problems for the POTW, the user shall immediately telephone and notify the director of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user.
(2)
Within five calendar days following such discharge, the user shall, unless waived by the director, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this article.
(3)
A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in paragraph (1), above. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notification procedure.
(g)
Reports from unpermitted users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports to the director.
(h)
Notice of violation/repeat sampling and reporting. If sampling performed by a user indicates a violation, the user must notify the director with in 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the director within 30 calendar days after becoming aware of the violation. The user is not required to resample if the director monitors at the user's facility at least once a month, or if the director samples between the user's initial sampling and when the user receives the results of this sampling.
(i)
Discharge of hazardous waste.
(1)
The discharge of any hazardous waste as defined under 40 CFR Part 261 is hereby prohibited without prior written authorization of the director. Discharge of certain hazardous materials may be allowed after submitting in writing to the director the following information: the name of the hazardous waste as set forth in 40 CFR Part 261; the EPA hazardous waste number; the type of discharge (continuous, batch or other); an estimation of the mass and concentration of such constituents in the wastestream to be discharged; and an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months.
(2)
Any user who receives written authorization from the director to commence the discharge of hazardous waste shall notify the receiving POTW, the EPA regional waste management division director and hazardous waste authorities, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and readily available to the user: an identification of the hazardous constituents contained in the wastes; an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month; and an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months. All notifications must take place no later than 180 calendar days after the discharge commences. Any notification under this paragraph need be submitted only once for each hazardous waste discharged. However, notifications of changed conditions must be submitted under section 82-241(e) of this article. The notification requirement in this section does not apply to pollutants already reported by users subject to categorical pretreatment standards under the self-monitoring requirements of sections 82-241(a), 82-241(c) and 82-241(d) of this article.
(3)
Dischargers are exempt from the requirements of paragraph (b), above, during a calendar month in which they discharge no more than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of non-acute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the user discharges more than such quantities of any hazardous waste do not require additional notification.
(4)
In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the director, the EPA regional waste management waste division director, and hazardous waste authorities of the discharge of such substance within 90 calendar days of the effective date of such regulations.
(5)
In the case of any notification made under this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical.
(6)
This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this article, a permit issued there under, or any applicable federal or law.
(j)
Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by EPA.
(k)
Sample collection.
(1)
Except as indicated in subsection (2), below, the user must collect wastewater samples using flow proportional composite collection techniques. In the event flow proportional sampling is infeasible, the director may authorize the use of time proportional sampling or a minimum of four (4) grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits.
(2)
Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques.
(l)
Timing. Written reports will be deemed to have been submitted when received on or before the required date. Submittals received by mail after this date, will be considered late even though postmarked on or before the required date.
(m)
Record keeping. Users subject to the reporting requirements of this article shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this article and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the county, or where the user has been specifically notified of a longer retention period by the director.
(n)
Operator and lab analyst certification.
(1)
Industrial pretreatment facility operators who are working at and who remain at an industrial wastewater treatment facility on July 1, 1991, will have until July 1, 1996 to obtain either a minimum class III wastewater treatment plant operator certificate or industrial wastewater operator certificate as issued by the Georgia Board of Examiners for Certification of Water and Wastewater Treatment and Operators and Laboratory Analysts. Any uncertified operator hired after July 1, 1991 will have 12 months from the start of employment to obtain certification.
(2)
Any industrial laboratory analyst who conducts certain tests, as defined by the board of examiners for certification of water and wastewater treatment and operators and laboratory analysts, in conjunction with the operation of an industrial pretreatment facility shall obtain a certificate from said board; provided, however, that an industrial wastewater pretreatment plant shall be required to have only one responsible analyst obtain such a certificate, and any other analyst in that facility shall be supervised by such person. Any new analyst in responsible charge who is hired after July 1, 1991 will have 12 months from the start of employment to obtain the needed certificate. Any person who has obtained or shall obtain a class I or class II certification by the board as a wastewater treatment plant operators shall not be required to obtain a laboratory analyst certificate from the board to provide services as a laboratory analyst.
(3)
This certification requirement only applies to industries with pretreatment permits. The county will determine which level of certification is needed on a case-by-case basis.
(Res. No. 06-1167, 11-15-06)