§ 34-601. New equipment, construction and materials.
Latest version.
The board of health may allow test grants, conditional construction permits or conditional
permits for new designs, new equipment, new materials, or new processes proposed for
use or installation in new or existing pools, if satisfactory proof is submitted to
the board of health that sound engineering and public health principles are complied
with as determined by the board of health. Performance guarantees shall be required.
Conditional permits shall require satisfactory performance in the field for a defined
time to be established by the board of health before a final permit is issued. The
board of health reserves the right to revoke any temporary permit if satisfactory
performance cannot be demonstrated in accordance with the current policy and procedures
addressing new products and processes and this article. A fee shall be required for
each evaluation in accordance with the board of health's current fee schedule.
(Ord. No. 09-0120, 1-7-09; Ord. No. 18-0340, Att. A, 5-16-18)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');