§ 34-601. New equipment, construction and materials.  


Latest version.
  • The board of health may allow test grants, conditional construction permits or conditional permits for new designs, new equipment, new materials, or new processes proposed for use or installation in new or existing pools, if satisfactory proof is submitted to the board of health that sound engineering and public health principles are complied with as determined by the board of health. Performance guarantees shall be required. Conditional permits shall require satisfactory performance in the field for a defined time to be established by the board of health before a final permit is issued. The board of health reserves the right to revoke any temporary permit if satisfactory performance cannot be demonstrated in accordance with the current policy and procedures addressing new products and processes and this article. A fee shall be required for each evaluation in accordance with the board of health's current fee schedule.

(Ord. No. 09-0120, 1-7-09; Ord. No. 18-0340, Att. A, 5-16-18)