Permission is required from the county to connect to or discharge into any drainage
system, conveyance system, or watercourse within the county. Permission shall be implied
as part of an approved stormwater management plan from the county. Deviations from
the approved stormwater management plan, that do not have the permission of the county,
shall be deemed an illicit connection and in violation of division 6 of this article,
and shall prohibit the county from issuing a certificate of occupancy or recording
of the final plat, even if the deviations result from mistakes to or omissions from
the stormwater management plan or changes that occur in the field.
(95-0093, art. II, § D, 3-15-95; Ord. No. 08-0194, 2-20-08)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');