§ 10.2. Utility fees.
Latest version.
Following the approval of a land disturbance permit and prior to authorization to begin construction, the developer shall pay the required inspection, water and sewer connections, curb cut, and street sign fees as may be established by the board of commissioners. (Amended 9-2-15)